Method Statement For Laying Kerbs, Precast Concrete

Provide customers with tailor-made solutions

CONCRETE KERB CASTING METHOD STATEMENT – HIGHWAY

15/06/2020  After laying the kerbs and just prior to 6 to 8 hours after laying of the concrete, saw cut grooves will be provided at 5m intervals or as specified by the engineer. Curing of kerb will be done by applying curing compound / or any other suitable method Vertical and horizontal tolerances with respect to true line and level will be + 6mm.

Get Price

Method Statement Kerbs and Gully Construction Builders ...

04/08/2016  Basic Method Statement Kerbs and Gully Construction. Posted By safetyadmin On Thursday, August 4, 2016 07:59 AM. Under Method Statements . Check that the issued construction drawing is the latest revision. Kerbs. 1. Engineer to set out Kerb lines, gully and manhole positions. 2. Kerb pans to be set up and concreted in accordance with the design spec. 3. String lines to be tied to the kerb

Get Price

INSTALLATION DETAILS FOR KERB EDGINGS - Concrete

The mortar should be allowed to harden before the kerbs or edgings are ‘backed’ and protected from adverse weather conditions. Backing concrete (haunching) should be installed in order to support the kerbs or edgings up to around two thirds of the height of the kerb or edging. This backing may have to be reduced to accommodate the materials that will be at the back of the kerb or edging when the work is

Get Price

Health Safety Documentation Method Statement

6. Key kerbs to be laid upon a bed of mortar or concrete and haunched. 7. Edgings to be laid upon a minimum bed of 100mm of concrete and haunched. 8. Infill the hard margin with a minimum of 150mm of concrete and level prior to laying of block paving. 9. Block paving is then laid upon a screeded sand bed or bedded upon and pointed with mortar ...

Get Price

MS 14 Safety Method Statement External Works

MS 14 Safety Method Statement – ... E. Precast Concrete Edgings and Kerbs The precast concrete edgings and kerb shall be obtained from a manufacturer approved by the Contract Administrator and manufactured to comply with BS 7263: Part 1:1990 and laid on edge with top 6mm below finished level of adjacent surface. F. Macadam Topping Re-topping shall be 19mm hot applied tarmacadam topping in ...

Get Price

METHOD STATEMENT

To supply and lay new 255 x 125mm HB kerbs on concrete bed and haunch. To supply and fit 2 no. new 900 x 450mm diameter plastic road gullies with 425 x 425mm cast iron gratings. To connect to existing drainage with 10mm diameter plastic pipe. To supply and lay 200mm depth of granular sub-base, 60mm depth of AC 20 dense binder 100/150 asphalt and 30mm depth of AC 10 close surface 100/150 ...

Get Price

17-road kerb - METHOD OF STATEMENT FOR ROAD KERB 1

METHOD OF STATEMENT FOR ROAD KERB 1. Before a complete site mobilisation of kerbing works take place, the pegging of finished kerb levels are carried out by the main contractor and sub-contratcor to levels furnished by surveyors. 2. The cement : quarry dust : aggregate ratios of a pre-determined compressive strength prior to the construction of extruded cast in-situ concrete is formulated.

Get Price

Metod Statement and Risk Assessment-1

METHOD STATEMENT SECTION: WALL CONSTRUCTION Construction 18mm ply. Props Steel Reinforcement Plant Concrete Pump 1.5 Ton Excavator Air Vibrators CP9 Rotary Drill Props Sequence Kicker cast in position shown on drawings Top of kicker lightly scabbled or treated with retarder Volclay shot fired to steel piles. Steel reinforcement fixed into position shown on drawing and spaced with

Get Price

Precast Kerb Installation Guidelines - Bosun

Precast Kerb Installation Guidelines The guidelines below are largely based on SANS 1200MK, the official South African Standard for the installation of precast concrete kerbs. As SANS 1200MK was last updated in 1983, we have also included key points from the British standard for the installation of precast concrete kerbs. The following is stipulated in []

Get Price

Method Statement Risk Assessment - Scottish Government

Method Statement Form SF 25 Rev: 05 Page 1 of 17 Method Statement Risk Assessment Project Name: CRAIGENDORAN RISING MAIN Location of the Works: CRAIGENDORAN, HELENSBURGH. Title of method statement: ENVIRONMENTAL PROTECTION PROCEDURES DURING PIPE LAYING AT CRAIGENDORAN RISING MAIN. Scope of works The task involves the installation of HDPE

Get Price

Edgings Kerbs - Concrete Bedded Edgings Pavingexpert

Concrete bedded edgings and kerbs are used wherever a rigid support or restraint is required at the edge or perimeter of a pavement. They are possibly the most useful format of edging, and this page explores their construction and potential uses. Table of Contents. Introduction: Concrete bedded edge restraints are essential for block paving and tarmacadam driveways, and can be used for all ...

Get Price

Edgings Kerbs - Road Kerbs Pavingexpert

The method of laying is covered in detail on the Concrete Bedded Edgings page and on the Aligning Kerbs page. A full-sized pavior's mall is preferred for tapping the kerbs down to the correct level. It is usual to remove any concrete bedding from the front of the kerb, as this is said to prevent 'differential settlement' in subsequent paving. The joints are often not mortared, but are laid as ...

Get Price

Method Statement For Installation Of Hardscape Works ...

Method Statement For Hardscape Works: Execution of Hard scape and paving Works shall be completed as per details, pattern design shown on the approved shop drawings and manufacturer’s recommendations. The visual appearance shall be consistence throughout. Hard scape / paving material shall be free from all defects like vents, cracks ...

Get Price

METHOD STATEMENT

To supply and lay new 255 x 125mm HB kerbs on concrete bed and haunch. To supply and fit 2 no. new 900 x 450mm diameter plastic road gullies with 425 x 425mm cast iron gratings. To connect to existing drainage with 10mm diameter plastic pipe. To supply and lay 200mm depth of granular sub-base, 60mm depth of AC 20 dense binder 100/150 asphalt and 30mm depth of AC 10 close surface 100/150 ...

Get Price

method statement concrete kerb laying

Safe work method statements. Tilt-up or precast concrete Work on If you have any questions on how to complete your safe work method statement please call the health and safety team on... Know More. RIICRC302A Place and form concrete kerb channel and. RIICRC302A Place and form concrete kerb JSAs/safe work method statement RIICRC302A Place and form concrete kerb... Know More. Kerb

Get Price

Precast Kerb Installation Guidelines - Bosun

Precast Kerb Installation Guidelines The guidelines below are largely based on SANS 1200MK, the official South African Standard for the installation of precast concrete kerbs. As SANS 1200MK was last updated in 1983, we have also included key points from the British standard for the installation of precast concrete kerbs. The following is stipulated in []

Get Price

Concrete kerb units Requirements and test methods

precast concrete kerb units, channels and complementary fittings, that are for use in trafficked paved areas and roof coverings. The units are used to fulfil one or more of the following: Separation, physical or visual delineation, the provision of drainage or the containment of paved areas or other surfacing. In case of regular use of studded tyres, additional requirements are sometimes ...

Get Price

Method Statement Risk Assessment - Scottish Government

Method Statement Form SF 25 Rev: 05 Page 1 of 17 Method Statement Risk Assessment Project Name: CRAIGENDORAN RISING MAIN Location of the Works: CRAIGENDORAN, HELENSBURGH. Title of method statement: ENVIRONMENTAL PROTECTION PROCEDURES DURING PIPE LAYING AT CRAIGENDORAN RISING MAIN. Scope of works The task involves the installation of HDPE

Get Price

method statement concrete kerb laying

method statement concrete kerb laying. METHOD STATEMENT FOR CONCRETE ASPHALT PAVING Know More. METHOD STATEMENT BRIEFING RECORD CONCRETE ASPHALT PAVING Briefing delivered by Mohamed Youssef Emam Position QA/QC Manager Date 06 th SEPTEMBER 2017 We the undersigned have read and understood the attached method statement and will comply with

Get Price

Edgings Kerbs - Road Kerbs Pavingexpert

The method of laying is covered in detail on the Concrete Bedded Edgings page and on the Aligning Kerbs page. A full-sized pavior's mall is preferred for tapping the kerbs down to the correct level. It is usual to remove any concrete bedding from the front of the kerb, as this is said to prevent 'differential settlement' in subsequent paving. The joints are often not mortared, but are laid as ...

Get Price

Metod Statement and Risk Assessment-1

METHOD STATEMENT SECTION: WALL CONSTRUCTION Construction 18mm ply. Props Steel Reinforcement Plant Concrete Pump 1.5 Ton Excavator Air Vibrators CP9 Rotary Drill Props Sequence Kicker cast in position shown on drawings Top of kicker lightly scabbled or treated with retarder Volclay shot fired to steel piles. Steel reinforcement fixed into position shown on drawing and spaced with

Get Price

What Is Road Kerb - Types Construction Methodology ...

In those situations, precast concrete blocks shall be used. ... After laying the kerbs and just prior to hardening of the concrete, saw cut grooves shall be provided at 5m interval. Vertical and horizontal tolerance with respect to true line and level shall be +/- 6 mm. Curing of kerb shall be done by brushing it with curing compound and spread the hessian cloth over it and keeping it moist ...

Get Price

Method Statement For Installation Of Hardscape Works ...

Method Statement For Hardscape Works: Execution of Hard scape and paving Works shall be completed as per details, pattern design shown on the approved shop drawings and manufacturer’s recommendations. The visual appearance shall be consistence throughout. Hard scape / paving material shall be free from all defects like vents, cracks ...

Get Price